North Head WRRF Fine Screen 6 Renewal
Scope of Works
This project involved the rehabilitation of a critical wastewater treatment asset, including termination of the existing HDPE lining system and demolition of the deteriorated concrete hob wall. Our team then installed formwork, steel reinforcement and placed concrete for the new hob wall, incorporating a cast in-situ HDPE AKS lining system to provide long-term corrosion protection. We then extrusion welded the newly installed lining system, creating a fully sealed and integrated concrete protective liner.
Client
Process Engineering Technologies
End User
Sydney Water